Ground Works and pipe runsIFC has considerable experience in the design, supply and Installation of
both carbon steel and Durapipe plastic pipe work. Inside the tank bund and where the pipe work is above ground we recommend Schedule 40
grade carbon steel pipe. Each length would be direct welded or flanged to prevent leakage normally found with screw-threaded
systems. A red oxide primer and two topcoats of durable topcoat are app
If the monitor is constantly "topping up" the system then at a set point it will alarm alerting the service department to a potential fault & can be investigated before a containment break occurs.
|
|
|
Leaders in Tanker Loading and Safe Tanker Access
Laying pipework, both steel and twin wall plastic
|
|
|||||
|
|
|||||
|
|